Projects Execution Division
Pollution Control Board – Consultancy
As per the Water Act 1974 and Air Act 1981, it is mandatory to obtain Consent to Establish (NOC) from respective State Pollution Control Board before commencement of the construction activities on the site. The process for obtaining consent to establish involves making an application in a prescribed format to respective State Pollution Control Board along with required documents and scrutiny fees. It is followed by physical inspection of the site and assessment of the environmental management system proposed so as to meet with the mandatory requirement prescribed by State Pollution Control Board.
Similarly as per the Water Act 1974 and Air Act 1981, it is mandatory to obtain Consent to Operate (CTO) from respective State Pollution Control Board prior to commencement of the production activities. The process for obtaining consent to operate involves making an application in a prescribed format to respective State Pollution Control Board along with required documents and scrutiny fees. It is followed by physical inspection of the site to verify the compliance and implementation of the conditions of the CTE (NOC) issued by the State Pollution Control Board.
AQUA TECHNOLOGIES is a premium PCB Compliance Clearance Services supplier. Our strength our cutting-edge technologies and expertise to manufacture and offer high volume water treatment plants for each one-time and non-business industry. Surpassing through milestones, we have a tendency to are fully equipped with innovative eco-solutions and engineering principles so as for improving natural environment.
Advantage
- We provide consulting and liaison services for obtaining Clearances from PCB (Pollution Control Board Authority) for industrial, commercial & residential projects
- We take up all new and existing industrial projects
- We undertake application preparations, submission of drawings in line with norms & to the Government Authorities
- Clarifications & Updates in the drawings will be done as per the Client’s requirements
- We take single handed responsibility for obtaining the final approval and Clearance Certificate from PCB
Application
- Chemical Industries,
- Drug Industries,
- Pharma Industries,
- Refineries,
- Leachates,
- Textile Industries,
- Tanneries,
- Rubber Industries,
- Automobile Industries
- Food & Beverages
- Electroplating Industries
- Hospitals
- Bricks Manufacturing Industries
- Crushers